
New TopShim run:

version = topshim 2.0.0
date = 2024-04-18
time = 03:16:10.322
command = topshim 

FINE SHIMMING

Parameters:

probe = Z116098_0527
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 8.3 Hz, Target= 0.7 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 1.0 Hz
Iteration  3: FWHM Before= 1.0 Hz, Target= 0.5 Hz, After= 1.1 Hz
Iteration  4: FWHM Before= 1.1 Hz, Target= 1.3 Hz, After= 1.5 Hz
Iteration  5: FWHM Before= 1.5 Hz, Target= 1.0 Hz, After= 0.8 Hz
Iteration  6: FWHM Before= 0.8 Hz, Target= 0.7 Hz, After= 0.6 Hz
Iteration  7: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 0.3 Hz
Iteration  8: FWHM Before= 0.3 Hz, Target= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.823

shim changes: 
Z	+164
Z2	-5
Z3	+115
Z4	-114
Z5	+64

duration = 2 min 45 sec
completed successfully
finished Thu Apr 18 03:18:54 2024


========================================================================
